Chapter 2 SRG50 overview 25
SRG50 Configuration Guide
The figure Process map for installing and configuring an SRG on page 26 provides a process map
for installing and configuring an SRG50. The procedures in this document assume that the
following activities have been completed:
• The BCM50, including media bay modules, cabling, telephones, and peripherals, have
been installed.
• BCM50 administration has been set up.
• The basic parameters of the BCM50 have been configured.
• CS1000 main office system has been installed and configured to support SRG.
• The SRG has been connected to the LAN (as required) and WAN (to the main office).
• System functionality has been tested to this point.
• Attached devices have been installed and configured (for information about
configuring IP Phones, see IP telephones setup and configuration on page 53).
• Non-SRG-specific networking and device configuration has been completed (for
information about configuring the network, see Setting up the private VoIP network on
page 65).