Pepper Computer RS232 Network Card User Manual


 
SMART I/O User’s Manual
©1996 PEP Modular Computers GmbHMarch 12, 1996 Page 1 - 23
Introduction
1
It should be noted that the standard ISA-Terminal is configured for COM2. If
another port is required then the switch to the new one is made by firstly
starting the ISA-Terminal program and then selecting the Settings from the
Communication pull-down menu. Here the possibility exists to select the
desired communications port. When leaving the ISA-Terminal environment,
remember to save the configuration if changes have been made.
The installation of the ISaGRAF development tool is now complete and
access is provided to a full IEC1131-3 programming platform.
The following sections deal with the application of this tool with the SMART
I/O and other PEP PLCs. Note that ‘C’ programming is not an option for the
SMART I/O Starter Kit and if required must be ordered separately through
one of the PEP offices or agents.