Chapter 2 - Hardware Installation
2-6
Mounting the MGC+100 in a 23” Rack
The MGC+100 can be mounted in a 23” rack using the two mounting plates
that are pre-installed on the unit.
1. Make sure that the MCU is turned OFF and it is disconnected from the
AC power.
2. Place the MCU in a 23” rack and support it, screw the mounting brackets
to the rack securing it with bolts and
self-locking nuts (which the client provides).
If the MGC+100 was shipped without the two mounting plates that are
usually pre-installed, refer to the MGC+ Hardware and Installation Manual,
Chapter 2 for a detailed description of the installation process.
For a detailed description of mounting the MGC+100 in a 19” rack, see the
MGC+ Hardware and Installation Manual, Chapter 2.
When the unit is installed on a rack, the rack must be properly grounded to the
central office ground. The rack must be grounded with two-hole compression-
type connectors using copper conductors (tinned or untinned). Wire, bus bar or
braided strap connectors are acceptable.