1 - 1
1
Setting up the Polycom RAS200A
This chapter describes the steps for setting up the Polycom RAS200A server,
which include:
• Inspecting the Package
• Specifying Required Materials and Equipment
• Ensuring System Safety
• Identifying System Connections and Controls
• Setting up the System
Inspecting the Package
Inspect the shipping box for the system and record any damage. If the system
has been damaged, file a claim with the delivery carrier.
Note: Polycom is not responsible for damage sustained during reshipment
of this product.
The package should include the following items:
• Polycom RAS200A system, with preinstalled video conferencing
management application software
• Power cord
• Rack-mount brackets
Specifying Required Materials and Equipment
The materials and equipment required to set up the system include:
• Polycom RAS200A system