4
Installation Instructions
This Quick Start Guide describes how to install and configure your new QLogic iSR6250 router by following these steps:
❑ Step 1. Verify the package contents.
❑ Step 2. Complete the pre-installation checklist.
❑ Step 3. Mount the router.
❑ Step 4. Install the SFPs.
❑ Step 5. Apply power to the iSR6250 router.
❑ Step 6. Install the SANsurfer
®
Router Manager.
❑ Step 7. Configure iSR6250 management port IP address.
❑ Step 8. Run the configuration wizard.
❑ Step 9. Present LUNs to iSCSI initiators.
❑ Step 10. Configure second blade.
Step 1. Verify the Package Contents
The iSR6250 router production package includes the following hardware components:
❑ iSR6200 router chassis with two blades installed
❑ DB9 to RJ45 cable adapter
❑ Power cable (6 foot black)
❑ Rail Mounting Kit, part number 50990-00
❑
WEEE Conformance Card
❑
Readme Notice Card
❑
China Optics and Cable SKUs Toxic Substance Table
Step 2. Complete the Pre-installation Checklist
During the initial configuration process, the system prompts you to enter information for each blade contained in the
iSR6250. Use the space provided in the following tables to record the IP addresses for each blade.
Table 1. Worksheet for Router Blade 1 (left) Parameters
Symbolic Name of the iSR6250 Blade 1
Management port IP address, subnet
mask, and gateway (if not using DHCP)
iSCSI port 1 IP address, subnet mask,
and gateway (GE-1)
IP address of the iSNS server for iSCSI
port 1 (if iSNS will be enabled)
iSCSI port 2 IP address, subnet mask,
and gateway (GE-2)