Chapter 2 Installation MBE Family Installation and Operation Manual
2-4 Installation and Setup
9. To enable direct connection between MBE and a UTP interface in any
workstation, set the STATION/HUB Switch to STATION (see Figure 2-4). This is
available only with the UTP option.
10. Replace the MBE cover.
11. Close by tightening the cover screw.
12. Proceed with the line, LAN and power connections as described below.
In certain locations where permanent excessive high voltages are present on
the lines, setting JP7 to NC may render the unit unsafe for connection to
unprotected telecommunication networks.
Power Supply
EPROM
MAIN
REMOTE
RESET
LOCATION
SW1
SW2
512K
128K
JP7
WATCH DOG
NC
OFF
ON
ON
CHASSIS
Link Interface
Module
LAN Interface
Module
AUI
BNC
UTP
Fuse
240 VAC/2A
Slow-Blow
Figure 2-1. MBE PCB Layout
Warning
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com