Site Requirements & Prerequisites 2-1
Chapter 2
Installation and Setup
This chapter provides instructions for mechanical and electrical installation of the
FCD-IPM unit.
After installation, you must configure the unit before further operation. Refer to
Chapter 4 for basic and advanced configuration instructions. In case a problem is
encountered, refer to Chapter 5 for test and diagnostics instructions.
No internal settings, adjustment, maintenance, and repairs may be performed
by either the operator or the user; such activities may be performed only by a
skilled technician who is aware of the hazards involved. Always observe
standard safety precautions during installation, operation, and maintenance of
this product.
2.1 Site Requirements & Prerequisites
Install AC powered FCD-IPM units within 1.5m (5 feet) of an easily accessible,
grounded AC outlet capable of furnishing the nominal supply voltage, 115 or
230 VAC. DC powered units require a 24 or -48 VDC power source.
Allow at least 90 cm (36 inches) of frontal clearance for operator access. Allow at
least 10 cm (4 inches) clearance at the rear for interface cable connections. The
ambient operating temperature of FCD-IPM is 0° to 50°C (32° to 122°F), at a
relative humidity of up to 90%, non-condensing.
The FCD-IP units are cooled by free air convection therefore in rack installation it is
necessary to leave sufficient space (at least 1U) above and below each unit to
enable free airflow.
Warning
Note