RuggedCom RS969 Switch User Manual


 
16
2008 RuggedCom Inc. All rights reserved Rev104
2.4 Dielectric Strength Testing
For dielectric strength testing in the field, users must remove the metal jumper located on terminal
2, 4, and 6 of the power supply terminal block. This metal jumper connects transient suppression
circuitry to chassis ground, and must be removed in order to avoid damage to protection circuits.
Figure 4 shows the proper dielectric strength test connections and should be followed to avoid
damage to the device.
Chassis
Ground
Surge
Ground
Figure 4: Dielectric Strength (HIPOT) Testing