Explain
This is cad mode procedure for using when design the new
project. This procedure is not included modify procedure.
Cad mode Procedure for using
Project Registration
Space management
Clean architectural
• Add the floor in the space management windows
• Specify the floor boundary
•
When
add
indoor,
The
area
recognized
the
room
and
it
will
01
02
• When design air-conditioning drawing, need to architectural
drawings, but almost no work to modify. So, disabling a
layer of architectural drawings and change gray color to
help convenient design work.
Clean architectural
drawing layers
Add In/outdoor
In/Outdoor
connection
Pit drawing
Pipe drawing
System check
•
When
add
indoor,
The
area
recognized
the
room
and
it
will
be added room Automatically.
• It can continue to draw level that all of indoor and outdoor
unit must be a connection.
• After select in in/outdoor connection windows, you can
drawing outdoor.
• Select the pit in the pit drawing window, you can draw
multiple outdoor pit.
• It can draw the pipe through Draw pipe/pipe accessories,
Draw communication wires/wired remote controller.
• It can connected main pipe to multiple indoor at once,
automatically Through Draw piping automatically, Draw
drain pipe automatically
• Refrigerant pipe connection , pipe length and pipe level
difference etc is checked.
• When system check is error, modify the part of guided in
system
check
and
check
again
.
03
04
05
06
07
08
SAMSUNG
System check
Control lines
drawing
Piping remarks &
Piping Diagram
Control Diagram
system
check
and
check
again
.
• Drain pipe connection is checked.
• the end of the system check, pipe diameter is placed
automatically.
• If click on the indoor to indoor, Communication wires and
wired remote controller can connected by a line.
• Insert the pipe remarks
• Insert piping diagram by click on the list in order on the
piping diagram field of report.
• Insert control diagram by click on the list in order on the
control diagram field of report.
08