Explain
It can register and start a new project when using command palette of cad mode.
Space management
Enter the building name.
It can create/modify the each floor, floor
height, distance between ceiling.
It can create/modify the room which get
into indoor .
It can upload the Excel file which include
building, floor, room information.
Space management
menu
Select
the
building’s
drawing
Project (Space management)
04
Cad mode interface
Select
the
building’s
drawing
Select the corresponding drawing of the
selected building.
Floor area individual selection
Select the floor area.
Floor area select batch
Select the floor area continuously.
It’s progress First floor in order to roof
floor. First floor of the specified zoning
box is intended to specify the upper
floors by clicking.
Room zoning
If add the room in information, it is
connected to drawing.
SAMSUNG
Architectural drawing background processing
Change the architectural drawing color
in gray and lock layer
Renewal
Renewal the space information.
Space information list
It can select the building.
It can view floor, room information of building.
All of the floor information displayed Next to the building
list(ex. B0~F1) ‘B’is the basement, ‘0’is basement floors, ‘F’ is
the ground, ‘1’is the ground floors.
Floor level displayed next to the floor list.
Area information displayed next to the room list.
If click each building, floor, room, More information can be
found below.
If double click each floor and room, The drawing is zoom-in.