MC
2
Power Systems User's Guide Chapter 1: Quick Setup
15 Power ON device(s).
If power system unit was sent with a workstation:
1 Check the power system unit and workstation for any physical damage.
2 For the MC
2
Power System Series 35 Amp-Hour units, the Power Output Disconnect
Switch must be in the ‘ON’ position.
3 Verify that all LED indicators for each power output channel are ON.
4 Output voltages and power cables are normally pre-configured to power on the
intended device(s) prior to shipping. Check the user-selectable switch settings to
verify that the correct voltage has been set for each power output channel.
5 Locate the power output plastic cover on the back side of the base. Remove the
power output plastic cover and verify that all cables have no physical defects and are
properly secured to each power output channel (Fig 2):
Fig 2: Location of plastic cover
Power
Output
Plastic
Cover
6 Plug in the power system unit to charge and verify that one or more LED indicators
on the fuel gauge is working properly.
7 Assemble and secure the power output plastic cover onto the cart.
8 Plug in the power system unit to charge prior to use. For optimal charging
performance, charge the unit with no devices ON.
9 Check fuel gauge to verify that the LED indicators for both ‘AC Present’ and
‘Charging’ are ON.
10 The power system unit is ready for use when LED indicator for ‘Charged’ is ON.
1110227 Revision 2
November 2006 3