MC
2
Power Systems User's Guide Chapter 3: 35 Amp-Hour Series
Preparing For Operation
Parts Listing
•
(1) Power system unit (Fig 16)
•
(1) Cord Set (Fig 17 and 18)
Fig 16: MC2 Power System Series 35 Amp-Hour
1 Unpack components carefully, inspecting for damage. WARNING: Power System is
HEAVY!
2 Confirm that the Power Output Disconnect Switch is in the ‘ON’ position. For more
information, see “
Identifying the Power System.” Verify that the green LED power
indicators light up beside the outputs.
Note:
The number of LEDs to light up will vary based upon the number of outputs
purchased.
3 Charge your MC² Power System using a Stinger Medical supplied cord set (Fig 17
and 18) for 24 hours prior to use. For more information, see “
Charging the Power
System
.”
Fig 17: Curly cord Fig 18: Cord reel
1110227 Revision 2
November 2006 13