SUPER MICRO Computer 6026TT-GIBXRF Server User Manual


 
2-10
SUPERSERVER 6026TT-GTRF/GIBXRF/GIBQRF User's Manual
2-6 Preparing to Power On
Next, you should check to make sure the SATA drives and the backplane have been
properly installed and all connections have been made.
Checking the SATA drives
The SATA disk drives are accessable from the front of the server and can be 1.
installed and removed from the front of the chassis without removing the top
chassis cover.
Depending upon your system's con guration, your system may have one or 2.
more drives already installed. If you need to install SATA drives, please refer
to Chapter 6.
Checking the Air ow
Air ow is provided by four 8-cm PWM fans and (for each serverboard) one 1.
air shroud. The system component layout was carefully designed to direct
suf cient cooling air ow to the components that generate the most heat.
Note that all power and data cables have been routed in such a way that they 2.
do not block the air ow generated by the fans.
Providing Power
Plug the power cords from the power supplies unit into a high-quality power 1.
strip that offers protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).2.
Finally, depress the power on button on the front of the chassis.3.