Precautions
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed for wet locations.
Never touch uninstalled telephone wires or terminals unless the telephone line has been disconnected at the network interface.
Use caution when installing or modifying telephone lines.
Avoid using a telephone (other than a cordless type) during an electrical storm. There may be a remote risk of electrical shock from
lightning.
Do not use the telephone to report a gas leak in the vicinity of the leak.
The socket outlet shall be installed near to the equipment and shall be easily accessible.
Never install cables without first switching the power OFF.
This product complies with directives: LVD 73/23/EC, EMC 89/366/EEC, R&TTE 99/5/EEC.
This product complies with the standards GR-63-CORE and GR-1089-CORE and is NEBS approved by UL .For NEBS compliance, the
product should be installed in the following manner:
- Use the enclosed rack brackets marked “NEBS”.
- There should be a clearance of 9.1cm between the product and any other product mounted in the rack.
Installation
Unpacking
To avoid damage to the unit during transportation, the gateway is delivered in a special shipping box, which should
contain the following components:
TANDBERG GW.
User Manual and other documentation on CD.
Rack-ears, screws and screwdriver.
Cables:
• Power cable
• Four ISDN PRI cables
• Ethernet cable