Transition Networks SISTP10XX-141-LR(T) Switch User Manual


 
Transition Networks SISTP10xx-141-LR(T) Industrial PoE Switch
24-Hour Technical Support: 1-800-260-1312 International: 00-1-952-941-7600
14
Connecting power to the Industrial PoE Switch, continued
Terminal-block wiring (continued)
Step Action
6.
Insert the terminal block plug into the Industrial PoE Switch’s terminal block, as
shown in Figure 10.
Figure 10: Wired Terminal Block Plug Inserted Into Industrial PoE Switch
7.
Make sure that the DC power source is stable and clean.
8.
Turn ON the power source and the PWR LED should turn ON along with PWR 1
LED and/or PWR 2 LED, depending on whether one or both power supplies are
connected and turned ON.
Note: An external AC/DC power supply is not included with the Industrial PoE Switch.
Transition Networks offers an accessory power supply that can be purchased
separately, if required. Please see optional accessories in the general information
section of this manual for ordering information.
CAUTION
The operating temperature of the Industrial PoE Switch, when used in conjunction with
an AC/DC power supply will be limited to the lesser operating temperature range of
either device.
For example: SISTP10xx-141-LRT (-40ºC to +65ºC operating temp) used
with 25080 (-10ºC to +60ºC operating temp)
Operating temp for combination is -10ºC to +60ºC