Transition Networks SMHB-TR-16 Switch User Manual


 
3. Installation
To install the StackMaster™TR 16-Port Active Retiming Managed Hub::
Unpack the StackMaster™TR Equipment
Stack Units in Rack or on Table
Cascade StackMaster™TR Units
Connect StackMaster™TR to Network
Connect Units to Power
Optionally Configure SNMP Network Management
3.1 Unpacking StackMaster™TR 16-Port Equipment
Use the packing contents lists to verify the shipment:
Item Part Number
StackMaster Modular Chassis SMHB-TR-16
Special 6-inch DB-25 data cable 6005
Power Cord 3344 (or refer to Appendix D)
User’s Guide 7361
3-1
USER’S GUIDE