Vanguard Managed Solutions 6435 Network Card User Manual


 
4-4 Powering Up Your Vanguard 6435/6455
Power Up Sequence
Booting the Node This table shows the sequence of LCD messages that appear when a Vanguard
6435/6455 already contains the Applications Ware software and is being booted:
Note
Digital Voice ports (Vanguard 6455) are booted twice when the node is warm
booted. Two “port boot complete” messages are displayed.
Step Display Message
1 BootPROM Vnn
2 Loading FIPL
3 Loading FBIST
4 Testing Node
5 BootPROM Vnn
6 Loading FIPL
7 Loading ONS
8 Booting ONS
9 --- Node Up ---
Note: nn is the version number.