3-26 Machine Maintenance Procedures
2. Remove tape covering board FFC (B) and mainboard connector (C). (Figure 3-23)
Figure 3-23. Function Board with FFC
NOTE:
NOTE:
Do not remove tape preventing FFC (B) from touching power contacts (E).
3. Disconnect board FFC (B) from mainboard connector (C).
4. Remove screw (D) from mainboard.
5. Remove board from lower cover.
Function Board Installation 0
1. Install board on lower cover. (Figure 3-23)
2. Install and secure screw (D) to mainboard.
3. Connect board FFC (B) to mainboard connector (C).
4. Install tape covering board FFC (B) and mainboard connector (C). (Figure 3-23)
5. Install upper cover.
ID Size Quantity Image
D M2x3 t=0.04 1
B
D
C
E