Acer Altos R520 Network Card User Manual


 
172
N
NIC module
installing
81
removing 79
O
opening the system 41
installing the front bezel 42
installing the top cover 44
removing the front bezel 41
removing the top cover 43
optical drive
installing
54
removing 53
P
PCI card
installing
59
removing 58
PCI riser assembly
installing
58
removing 56
peripherals 32
plastic guide
installing
55
power cord 33
power distribution board cover
installing
49
removing 48
power supply
installing
77
removing 78
processor
upgrade guidelines
61
R
rack
installing
155
rack installation 149
mounting pattern 154
precautions 151
RAID activation key
installing
82
removing 83
RAID BBU
installing
84
removing 85
RAID cache
installing
82
removing 83
RAID configuration
configuring integrated SAS
RAID
165
configuring integrated SAS SW
RAID
167
configuring onboard SATA
RAID
169
integrated SAS RAID
create RAID Volume
165
integrated SAS SW RAID
create RAID Volume
167
onboard SATA RAID
create RAID Volume
169
RAID configuration utility 163
rear panel 9
LED indicators 26
removing
ARMC/3 module
79
CPU 65
CPU air dam 47
CPU air duct 45
FBDIMMs 74
front bezel 41
HDD 51
NIC module 79
optical drive 53
PCI card 58
PCI riser assembly 56
power distribution board cover 48
power supply 78
RAID activation key 83
RAID BBU 85
RAID cache 83
SATA software RAID activation
key
88
top cover 43
S
SATA software RAID activation key 87
installing 87
removing 88
setting up the system 31
preinstallation requirements 31
specification
chipset
3
control panel 5
graphic interface 5
I/O ports 5
media storage 3
memory subsystem 3
networking 5
OS 6
PCI I/O 5
power supply 6
processor 3
SAS models 4
SATA models 4
server management 5
system fan 6
system boards 11
backplane board 13
SAS/SATA backplane
board
13
mainboard 11
mid-plane board 15
active mid-plane board 15
passive mid-plane board 16
system diagnostic LEDs 21
system features 3