ADTRAN IPR-S1000 Network Router User Manual


 
Installing the IPR-S1000
4
Protect the equipment
1) Never assume that electrical power is disconnected. Do check it
first.
2) Do a previous check-up of any potential source of danger within
your work environment (wet floor, visible electrical cable...).
3) Always disconnect AC power cable during the installation when
moving the equipment.
3. Site requirements
To assure normal operation and avoid unnecessary maintenance, it is
recommended to prepare your site before installation.
Planning a proper location for the IPR-S1000
1) Place the IPR-S1000 into the desired location. The unit is designed
to be sitting vertically on a plane and clean surface.
2) Keep the product safe from heat, dust and moisture.
3) Make sure the site maintains an ambient temperature of 5° to 45°C.
4. Installation checklist
To assist you with your installation and to provide a historical record of
what was done and by whom, fill in the following IPR-S1000 installation
checklist.
Installation Checklist
Task
Verified
by
Date
Date the IPR-S1000 received
The IPR-S1000 and accessories unpacked
Types and numbers of interfaces verified
Safety recommendations and guidelines
reviewed
Site requirements verified