AEG PROTECT 1.100 Power Supply User Manual


 
22
4 Set-up
4.1 Unpacking and Inspection
The unit has been completely checked and inspected. Although
the unit has been packed and shipped with the usual care,
transport damage cannot be completely excluded.
i
Any claims due to transport damage must
always be asserted against the transport
company!
Check the shipping container for damage on arrival. If
necessary, ask the transport company to check the goods and
make a record of the damage in the presence of the transport
company employee and report the damage to the AEG
representative or dealer within eight days of delivery.
Check that the delivery is complete:
PROTECT 1. with 10000, 15000 or 20000 VA
Cable clamping unit
Special battery connection cable (PROTECT 1.100)
25-pin parallel operation cable
RS232 communication cable
Management software “CompuWatch” on CD
Operating instructions
Delivery of external battery modules includes:
External battery unit
Battery connection cable
Battery fuses and terminal connectors (PROTECT 1.
BP20)
Please contact our hotline (see page 5) in case of any
discrepancy.
The original packaging provides effective protection against
mechanical shocks and should be retained so the unit can be
transported safely later on.