Allied Telesis AT-X210-24GT Switch User Manual


 
AT-x210-9GT, AT-x210-16GT, and AT-x210-24GT Switches Installation Guide
45
Figure 36. Switch Initialization Messages (Continued)
Assigning Active Workload to HA processes:
hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd
lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd
Received event network.activated
Loading default configuration
Warning: flash:/default.cfg does not exist, loading factory defaults.
..
done!
Received event network.configured
awplus login: