American Power Conversion PD60G6FK1 Power Supply User Manual


 
36 60 kW InfraStruXure PDU—Operation and Configuration
Configuring the InfraStruXure Manager
Connect the InfraStruXure PDU to the InfraStruXure Manager
1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection
plate.
You can make connections from
inside the enclosure, or you can
remove the user connection plate
and make your connections.
Remove the plate using a Phillips
or standard screwdriver to loosen
the two captive screws. Use the
knockout in the plate to route
cables to and from the user
connections on the plate. If you
remove the plate, make sure that
you do not disturb the existing connections.
2. Run the connected Cat-5 network cable through the knockout in the user connection plate to the
Information Controller Hub.
3. Once all APC InfraStruXure-Certified equipment is installed, the network cables are connected
to the Information Controller Hub, and start-up of the system is complete, configure the
Information Controller.
See als
o
For detailed configuration instructions, see the Information Controller Installation and
Quick-Start manual included with your Information Controller.