APC NBRK0200 Power Supply User Manual


 
NetBotz Rack Monitor 200 Installation and Quick Configuration Manual6
How to Install the Rack Monitor 200
Note: Install the Rack Monitor 200 in an environment compatible with the environmental
specifications on page 23.
Note: When you install the Rack Monitor 200 in the rack, do not create a hazardous
condition due to uneven mechanical loading. For example, do not use the Rack Monitor 200
as a shelf.
You can install the Rack Monitor 200 in the front or the rear of the rack using the rack-mount option,
which requires 1 U of rack space. If using an APC NetShelter
®
VX or SX rack, you also have the option
to use the toolless peg-mounts, which do not use any U-spaces.
Toolless peg-mount installation
Note: The toolless peg-mount installation is only available with a NetShelter VX or SX rack
or enclosure.
Caution: To avoid equipment damage, use only the hardware provided when installing the
power cord retainer bracket.
1. Install the power cord retainer bracket as shown.
2. In the left or right cable channel in the rear panel of the
enclosure, install the Rack Monitor 200 in a set of mounting
holes. Be sure to push down until it locks.
3. See “Power cord and network cable connections” on page 8.
8-32 x 1/4-in Phillips-head screws
Power cord retainer bracket