APC NBRK0200 Power Supply User Manual


 
7NetBotz Rack Monitor 200 Installation and Quick Configuration Manual
Rack-mount installation
1. Choose a location for the Rack Monitor 200 in the front or rear of the rack.
The Rack Monitor 200 occupies one U-space. A notched hole or a number
on the vertical rail of the rack denotes the middle of a U-space.
Caution: To avoid equipment damage, use only the hardware provided
when installing the brackets.
2. Install the brackets (
and
), including
the power cord retainer bracket, on the end
nearest the AC Line Inlet.
3. Secure the Rack Monitor 200 to the rack,
using cage nuts and screws (provided with
the rack).
4. See “Power cord and network cable
connections” on page 8.
8-32 x 1/4-in Phillips-head screws
Bracket
Power cord retainer bracket
AC Line Inlet