APC NBRK0200 Power Supply User Manual


 
NetBotz Rack Monitor 200 Installation and Quick Configuration Manual8
Power cord and network cable connections
Perform the steps below to complete the installation of the Rack Monitor 200.
Caution: Before you energize the Rack Monitor 200, review the electrical specifications on
page 23 to avoid overloading the circuit providing power.
Caution: Make sure you properly ground the Rack Monitor 200 by plugging it directly into
a wall outlet or by verifying the ground path if you connect the appliance to a power strip.
1. Connect the appropriate power cord to the AC Line Inlet of the Rack Monitor 200.
2. Secure the power cord to the power cord retainer bracket using the tie wraps.
3. Connect your 10/100 Base-T Network cable to the Rack Monitor 200.
4. Plug the power cord into a power source.
5. Use the hook and loop cable strap and the 25-mm (1-in) wide tie wrap to secure cables.