Chapter 2: Installation 9
Chapter 2: Installation
Getting Started
Before installing your AutoView 424 system, refer to the lists below to ensure
that you have all the items that shipped with the AutoView 424 as well as all
other items necessary for proper installation.
Supplied with the AutoView 424
Your AutoView 424 switch package contains the following items:
• AutoView 424 unit
• Local country power cord
• AutoView 424 Installer/User Guide
• AutoView 424 Quick Installation Guide
• Download Instructions
Optional items
• 19 inch Switch Mounting Bracket kit (available from Avocent)
• Serial cable, DB9 female
• Adaptors (available from Avocent)
Rack Mounting your AutoView Unit
You can either place your AutoView appliance on your desktop or rack mount
your unit into an EIA standard rack.
Obtain a Rack Mounting Bracket Kit (1U) from Avocent to rack mount your
AutoView. Before installing the switch and other components in the rack,
stabilize the rack in a permanent location. Start rack mounting your equipment
at the bottom of the rack, then work to the top.
CAUTION: Rack Loading - Overloading or uneven loading of racks may result in shelf or
rack failure, causing damage to equipment and possible personal injury. Stabilize racks in a
permanent location before loading begins. Mount components beginning at the bottom of the
rack, then work to the top. Do not exceed your rack load rating.
CAUTION: Power Considerations - Connect only to the power source specifi ed on the
unit. When multiple electrical components are installed in a rack, assure the total component
power ratings do not exceed circuit capabilities. Overloaded power sources and extension
cords present fi re and shock hazards.