Chapter 3: 6C105 Setup
3-8 6C105 Overview and Setup Guide
Figure 3-4 Installing the Power Supply Module(s)
After installation of the power supply modules is completed the 6C105 is
ready to be powered up; however, Cabletron Systems recommends that
installation of all modules for the 6C105 be completed before powering
up the 6C105. Refer to the following sections to complete the installation.
1
2345
PS1
PS2
Slotted Screw
Power Supply LEDs
Mandatory Power Supply Installed
in Slot PS1
Power Supply Handle
Slotted Screw
Circuit Card
Card Guides
Metal Back-Panel
2016_09
6C405