2-26
Cisco AC/DC Power System User Guide, R1.0
May 2006
Chapter 2 System Installation
2.5.2 Install 1 RU Distribution Shelf Load Connections
Figure 2-23 Installing GMT Cabling
Step 4
Connect cables to equipment that requires the supplied DC Power per that equipment’s specifications.
Step 5 Install fuses by sliding them into the appropriate slot (Figure 2-24).
Figure 2-24 Installing Fuses
Note An empty space should be left on each side of any 15A GMT fuse used for thermal considerations.
2.5.2 Install 1 RU Distribution Shelf Load Connections
The following section is for systems that use the 1 RU Distribution Shelf. For systems without the 1 RU
Distribution Shelf, go to Chapter 4, “System Operation.”
124771
Blank
15A Fuse
Blank