Cisco Systems 7200 VXR Switch User Manual


 
2-12
Cisco 7200 VXR Installation and Configuration Guide
OL-5013-09
Chapter 2 Preparing for Installation
Checking the Shipping Container Contents
Checking the Shipping Container Contents
Once you receive your Cisco 7200 VXR router, use the following procedure to check the contents of the
shipping container. Use the
Cisco 7200 VXR Component List in Table 2-3 to ensure you received all the
components you ordered.
Note Do not discard the shipping container. You need the container if you move or ship the Cisco 7200 VXR
router in the future.
Step 1 Verify that the following are included in the shipping container (the accessories box might be separate):
One Cisco 7200 VXR router, fully assembled (except the rack-mount and cable-management kit)
One or more accessories boxes (some or all may be shipped separately)
Step 2 Check the contents of the accessories box against the Cisco 7200 VXR Component List and the packing
slip to verify that you received all listed equipment, which should include the following:
One modular power cable for each AC-input power supply
One rack-mount and cable-management kit (four brackets and 14 mounting screws)
Optional equipment that you ordered, such as network interface cables, transceivers, or special
connectors
Cisco 7200 VXR router hardware and software documentation, if ordered
Note We no longer ship the entire router documentation set automatically with each system. You must
specifically order the documentation as part of the sales order. If you ordered documentation and
did not receive it, we will ship the documents to you within 24 hours. To order documents,
contact a customer service representative.
Step 3 Verify that the port adapters installed in your Cisco 7200 VXR router match the port adapter types on
the packing list.
Step 4 Proceed to the “Site Log” section on page 2-13, and then to Chapter 3, “Installing a Cisco 7200 VXR
Router,” to begin the installation.