Cisco Systems ASR 9001 Network Router User Manual


 
3-16
Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide
Chapter 3 Installing Modules and Cables in the Chassis
Cable Management
Step 4 Repeat Step 3 for all remaining interface cables, proceeding from the bottom ports upward, then proceed
to Step 5.
Step 5 Loosen the captive installation screw on the cable-management tray and remove the tray from the chassis
(Figure 3-9).
Cable Management Bracket
The Cisco ASR 9001 Router provides a cable management bracket at the middle of the router chassis.
Figure 3-10 shows a typical cable routing for the Cisco ASR 9001 Router.
Figure 3-10 Example Cable Routing through Cisco ASR 9001 Router Cable Management Brackets
Note When shipped, the cable-management bracket is not attached to the router chassis. You must attach the
cable-management bracket to the chassis before you insert the cables into the ports.
Installing a Cable Management Bracket
To install a cable-management bracket, follow these steps:
Step 1 Attach an ESD-preventive wrist or ankle strap and follow its instructions for use.
Step 2 Position the cable-management bracket over the front of the chassis front panel.
332699