Cooper Bussmann BU-905U-L Network Router User Manual


 
4
www.cooperbussmann.com/BussmannWirelessResources
Cooper Bussmann BU-905U-L Wireless I/O Installation Manual
About This Document
This document is the BU-905U-L Wireless I/O Installation Manual that describes how to install your BU-905U-L units and contains important
information for installing your units with other equipment.
NOTE: If your network only contains one transmitter and receiver pair, you should also read the BU-905U-L QuickStart Guides.
This document contains the following sections:
Section Read this section if you want to
Basic steps for using your unit Learn the basic steps for installing and using your unit.
Factory default configuration Understand how the transmitter sends information to the receiver.
Unit components Understand the different parts of your unit.
Antenna installation Learn how to install an antenna with your unit.
Resetting factory defaults Reset your unit to the original factory default settings.
Linking transmitter and receiver units Link your units to work as a dedicated pair.
Safety information Understand important safety information related to your unit.
NOTE: You must read this information before installing your unit.
Specifications Know technical information about your unit.
For more information, see the next sections.
I
NSTALLING Y
OUR UNIT
This section describes how to install your unit and contains the following sections:
Step Description For more information, see …
1, Read the safety information Lets you understand important safety information related to your Safety information on page 3.
unit. NOTE: You must read this information before installing your unit.
2. Get to know the unit features Understand the basic features of your unit. Unit components and
connections on page 5.
3. Install the antenna Learn how to install an antenna with your unit. Installing the antenna on page 9.
4. Install the power supply Learn how to install a power supply for your unit. Installing the power supply
on page 14.
5. Install the units Learn how to install your unit. Installing the unit on page 23.
6. Linking and configuring Learn how to link and configure your units to transmit and Configuring your units
the unit receive information. on page 24.
7. Test the unit Understand the principles for testing your units. Testing your units on page 25.
Note: To ensure internal surge protection works correctly, you must earth each unit using the Earth terminal.
For more information, see the next sections.
3A1580Rev1.6