Crestron electronic C2N-SPWS300 Power Supply User Manual


 
Crestron C2N-SPWS300 System Power Supply
Operations Guide – DOC. 8190 System Power Supply: C2N-SPWS300 13
C2N-SPWS300 (PWR OFF SLAVE Position), Hardware Hookup
NETWORK DATA LINK TO ADDITIONAL
EXPANSION POWER SUPPLY,
C2N-SPWS300 OR CNPWS-75
DAISY CHAIN METHOD
NETNET
24 ZY GZY G24
POWER EXPANSION (NETWORK DATA
LINK TO EXPANSION POWER SUPPLY,
C2NSPWS300 OR CNPWS-75)
NET
ZY G24
C2N-SPWS300
NC
24 ZY
NET
Y
NET
24G GZ
EXPANSION
POWER SUPPLY
NC
24 ZY Y24G GZ
NETWORK
UNIT
NETWORK
UNIT
NETWORK
UNIT
HOME RUN METHOD
NETWORK
UNIT
ZY
NET
G24
24 ZY Y24G GZ
CONTROL
SYSTEM
ZY
NET
G24
NET
24Y Z G
Hookup Procedure
1. Connect each network unit to the appropriate network connector.
2. Connect AC power to the C2N-SPWS300.
3. If a PC (running SIMPL Windows) is available, connect the PC to the
Cresnet system via the computer port on the control system.
4. From SIMPL Windows, select Tools | Viewport to open the Viewport.
5. Select Diagnostics | Report Network Devices (alternatively F4) to
verify that all network units are properly connected to the Cresnet
system.