Extron electronic 42-122-xx Network Card User Manual


 
Installation
AVTrac • Installation
16
Step 7: Finishing Up
At this point, the track and connectivity box must be secured to the floor, the electrical power must be connected, and
the AAP sockets must be populated.
To complete the installation of the AVTrac, follow these instructions:
7-1 Lay the cables and power cords flat against the base
track. If necessary, feed excess cable back into the
wall.
7-2 Snap the cover track onto the base track.
Ensure cables lay flat
Fit cover track
7-3 Before cutting and gluing carpet, remove all dust
and debris with a vacuum cleaner.
Cut the carpet or carpet tiles so that they run up
to but do not cover the aluminum track (see the
diagram below).
Cut carpet
Carpet covers ramps
but not track.
N
Cut the carpet to abut the edge of the cover
track. Do not align the cuts to the edge of
the ramps as this will leave a gap between
the end of the carpet and the cover track.