Page 5 - 12
Operations
© GBC Films Group June 2000
Orca 80-99 Operation and Maintenance Manual
PROCESS CONTROL CHART 2-2
Process: Hot Mount, One Pass
Materials (top/bottom): /3/16" thick Hot tissue coated board
Front Control Panel
Adjustments
Rear Control Panel
Adjustments
Top Brake OFF / NA Top Heat ON / 245
o
F (118
o
C)
Top Clutch OFF / NA Bottom Heat OFF / NA
Laminator Roller ON / 40 p.s.i. Top Cooling Fans OFF
Bottom Brake (front) OFF / NA Bottom Cooling Fans OFF
Bottom Clutch (front) OFF / NA Pull Roller Clutch OFF / NA
Forward/Reverse FORWARD Pull Roller Pressure OFF / NA
Speed 2 - 3 f.p.m. Bottom Brake (rear) OFF / NA
Laminator Roller Shims 3/16" Bottom Clutch (rear) OFF / NA
Pull Roller Shims NA
Helpful Hints/Notes:
Lay the image to be mounted on the board and push the board into the nip while the rolls are not
turning. Then, quickly, depress the foot switch to turn the rolls. Make sure to maintain good
paper tension while mounting the image.