2-16
Installing the Switch
Installation Procedures
2. Re-check the LEDs during self test. See “LED Behavior” on page 2-8.
Figure 2-11. Connecting the power cord on the Switch 2520G-24-PoE
3. For the Switch 2520G-8-PoE, use the included cable tie to secure the
power cord to the switch.
Figure 2-12. Securing the power cord on the Switch 2520G-8-PoE
cable tie