HP (Hewlett-Packard) 5400zl Network Card User Manual


 
2-12
Installing the Series 5400zl Switches
Installation Procedures
Installing the Series 5400zl
Switches
3. (Optional) Install Another Power Supply
Caution The Series 5400zl switches are designed to provide continuously operating
PoE power in the event of a single power supply failure with only a loss of
PoE power to lower priority ports.
If more than one power supply fails while the switch is at or near maximum
operating power (that is: the sum total of all PoE supply capacity minus the
largest supply, see chapter 2 and 4 of the ProCurve Power over Ethernet (PoE)
for zl and yl Products), loss of all PoE power may result.
To return PoE power to the ports, without causing the switch to reboot, when
there are two or more power supplies still supplying 12V power, unplug the
power cord for 5 seconds and replug it for each power supply one at a time.
Another, load-sharing redundant power supply (either a ProCurve Switch zl
875 W Power Supply (J8712A), or a ProCurve Switch zl 1500 W Power Supply
(J8713A) can be installed in the back of the switch. The 5406zl can hold up to
two power supplies and the 5412zl can hold up to four power supplies.
The 875 W Power Supply (J8712A) can supply up to 273 watts for PoE power.
The 1500 W Power Supply (J8713A) can supply up to 900 watts at 220 volts for
PoE power.
To prevent overloading of the building circuits breakers, the second power
supply must be connected to a different AC power source from the other
supply. This also helps with redundancy, if one AC power source fails, the
switch will continue to run.
Install the second power supply into power slot number 2 as shown in Figure
2-3. Although these procedures show the 6-slot chassis, the procedures are
the same for the 12-slot chassis.
The slot cover can be removed with either a flat-bladed or Torx T-10 screw-
driver. Retain the slot cover for future use.