HP (Hewlett-Packard) VA 7400 Server User Manual


 
VA 7100/7400 Cluster Installation Guide
10/12/01 38
6 Cluster Setup
Introduction
This chapter provides detailed instructions for performing the cluster setup.
Preliminary Operations
The following preliminary operations must be successfully completed before beginning the Cluster Setup Procedure.
1. Ensure that all requirements detailed in chapters 2 through 5 have been thoroughly reviewed and successfully
completed.
2. Ensure that storage array is powered up and maintained in accordance with the procedure of chapter 3.
3. Ensure that node 1 is powered up and running.
4. Ensure that node 2 is powered up but in Pause mode. Refer to step 16 of the Configuration Procedure of
chapter 5.
5. Ensure that the cluster Configuration Worksheet located in Appendix A has been completely filled out.
6. On the node 1 Windows 2000 Configure Your Server window shown below, click Finish setup.