30 Hardware Management Console (HMC) Case Configuration Study for LPAR Management
Figure 16 Selecting the scheduled operation
3. Next, in the Date and Time tab, select the time for the beginning of the
operation and a time window where the operation can be started as shown in
Figure 17.
Figure 17 Selecting the starting window of the scheduled operation
4. Click on the Repeat tab and select the days of the week for running the
scheduler. We selected each day of the week for an infinite period of time as
shown in Figure 18 on page 31.