Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Chassis Feet (Pedestal Mode)
1. If you are installing this server into a rack system, skip
these steps and go to “Installing into a Rack (Rack
kbench.
assis. The
th only one set of holes in
oot, the middle hole should
face toward the front of the chassis. Hole locations for
the front foot are marked “F” and “1, 2”. On the back
foot, the middle hole should face toward the back of
the chassis. Location holes for the rear foot are
marked “F”.
Installing into a Rack (Rack Mode)
The Intel Server Chassis SC5200 is designed to be
sure to
rack cabinet enclosure that is EIA-310-d
mpliant. For additional compatibility and rack cabinet
lection information, see:
http://support.intel.com/support/motherboards/server/ch
Mode)” below.
2. Move the chassis to the edge of your wor
3. Use four screws to attach each foot to the ch
holes in the feet line up wi
the chassis. On the front f
compatible with the EIA-310-d rack standard. Be
select a
co
se
assis/sc5200
. Fully extend the rails.
4.
ack may vary from the illustration. Refer to your
rack documentation for information specific to your rack.
Hold the chassis so the rails on the chassis engage the rails in
your rack. You will need someone to help you at this point.
Disengage the locking tab on each rail and slide the server into
the rack.
1
2. Remove the smallest and innermost rail.
3. Position the rail.
Insert and tighten four screws.
5. Install the rest of the rail in your rack.
Note:
Your r
20