Linksys SRW224P Switch User Manual


 
35
Chapter 5: Configuring the Switch through the Web Utility
Switch Config
24-Port 10/100 + 2-Port Gigabit Switch with Webview and Power over Ethernet
100full - Supports 100 Mbps full-duplex operation
1000full - Supports 1000 Mbps full-duplex operation
Sym (Gigabit only) - Check this item to transmit and receive pause frames, or clear it to auto-negotiate the
sender and receiver for asymmetric pause frames. (The current switch chip only supports symmetric
pause frames.)
FC - Supports flow control
Flow control can eliminate frame loss by “blocking” traffic from end stations or segments connected
directly to the switch when its buffers fill. When enabled, back pressure is used for half-duplex operation
and IEEE 802.3x for full-duplex operation. (Avoid using flow control on a port connected to a hub unless it
is actually required to solve a problem. Otherwise back pressure jamming signals may degrade overall
performance for the segment attached to the hub.)
(Default: Autonegotiation enabled; Advertised capabilities for 100BASE-TX – 10half, 10full, 100half,
100full; 1000BASE-T – 10half, 10full, 100half, 100full, 1000full; 1000BASE-SX/LX/LH – 1000full)
LAG. Indicates if a port is a member of a LAG.
Modify the required interface settings, and click submit.