4
I
NSTALLING THE
S
CANNER TO THE
H
OST
(S
TANDARD
F
EATURES
)
Primary/Secondary setup continued from previous page.
All equipment must be connected before power-up. After both units complete the
power-up diagnostics, the operator will need to program the primary unit with the
MetroSet Program provided.
Additional Equipment needed: Primary/Secondary Cable [
MLPN
52-52707]
To avoid potential problems, do not power up the scanner until the
communication cable is secured to the host.
1. Turn off the host system.
2. Connect the
communications cable to
the HoloTrak
®
primary
scanner and to the host.
3. Connect the
Primary/Secondary cable
to the primary scanner and
the secondary scanner.
4. Check the AC input
requirements of the power
supplies for both scanners
to make sure the voltages
match the AC outlets.
5. Connect the power
supplies to the scanners.
6. Plug the power supplies
into the AC outlets to
supply power to the both
scanners.
7. Power up the host system.
Caution:
To maintain compliance with applicable standards, all circuits connected to the scanner must meet
the requirements for SELV (Safety Extra Low Voltage) according to EN/IEC 60950-1.
To maintain compliance with standard CSA C22.2 No. 60950-1/UL 60950-1 and norm EN/IEC 60950,
the power source should meet applicable performance requirements for a limited power source.