Important Information
ix
[Important 2] Clearance for Installing the Projector
Allow ample clearance between the projector and its surroundings as shown below.
Avoid installing the projector in a place where air movement from the HVAC is directed
at the projector.
Heated air from the HVAC can be taken in by the projector's intake vent. If this happens,
the temperature inside the projector will rise too high causing the over-temperature pro-
tector to automatically turn off the projectors power.
Example 1 – If there are walls on both sides of the projector.
Note:
The drawing shows the
proper clearance required
for the front, back and top of
the projector.
Example 2 – If there is a wall behind the projector.
(1) For floor installation:
Note:
The drawing shows the
proper clearance required
for the back, sides and top
of the projector.
(2) For ceiling mounting:
Note:
1. The drawing shows the
proper clearance required
for the front, sides, back and
bottom of the projector.
2. If suspending the projec-
tor 30 cm/12 inches away
from the ceiling, allow ample
clearance for all four sides
and the under the projector.