Page 13 of 24
CHAPTER 3: INSTALLATION
This chapter describes the installation procedures for your NETGEAR Model GSM712/GSM712F Managed
Gigabit Switch. Switch installation involves the following steps:
Step 1: Preparing the site
Step 2: Installing the switch
Step 3: Installing a GBIC module
Step 4: Checking the installation
Step 5: Applying AC power
Step 6: Connecting to the console port to manage the switch (initial configuration)
Step 7: Connecting devices to the switch
Step 1: Preparing the Site
Before you install your switch, be sure your operating environment meets the operating environment
requirements in Table 3-1.
Table 3-1. Site Requirements
Characteristics Requirements
Mounting
Desktop installations:
Rack-mount installations:
Provide a flat table or shelf surface.
Use a 19-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically
secure. You also need the rack-mount kit supplied with your switch.
Access
Locate the switch in a position that lets you access the front panel RJ-45 ports, view the front
panel LEDs and power connector.
Power source
Provide a power source within 6 feet (1.8 meters) of the installation location. Power specifications
for the switch are shown in Appendix C. Be sure the AC outlet is not controlled by a wall switch,
which can accidentally turn off power to the outlet and the switch.
Environmental
Temperature: Install the switch in a dry area, with ambient temperature between 0 and 40ºC (32 and 104ºF).
Keep the switch away from heat sources such as direct sunlight, warm air exhausts, hot-air vents,
and heaters.
Operating humidity: The installation location should have a maximum relative humidity of 90%, non-condensing.
Ventilation: Do not restrict airflow by covering or obstructing air inlets on the sides of the switch. Keep at least
2 inches (5.08 centimeters) free on all sides for cooling.
Be sure there is adequate airflow in the room or wiring closet where you intend to install the
switch.
Operating conditions: Keep the switch at least 6 ft (1.83 m) away from nearest source of electromagnetic noise, such as
a photocopy machine.
Step 2: Installing the Switch
You can install your NETGEAR Model GSM712/GSM712F Managed Gigabit Switch on a flat surface or in
a standard 19-inch rack.
Installing the Switch on a Flat Surface
The switch ships with four self-adhesive rubber footpads. Stick one rubber foot pad on each of the four
concave spaces on the bottom of the switch. The rubber footpads cushion the switch against
shock/vibrations.