Nx Networks NX series Power Supply User Manual


 
REFER TO THE
START-UP QUICK GUIDE
BELOWDURING INSTALLATION AND COMMISSIONING.
IF ANY PROBLEMS OCCUR, PLEASE CONTACT YOUR LOCAL DISTRIBUTOR
.
Start-up Quick Guide
1. Check that the product corresponds to your order, see Chapter 3.
2. Read the safety instructions carefully in Chapter 1, before commencing
commissioning.
3. Before the mechanical installation, check the minimum clearances around the
unit and check the ambient conditions in Chapter 5.
4. Check the size of the motor cable, mains cable, mains fuses and check the
cable connections, read Chapters 6.1.1.1 – 6.1.1.4.
5. Follow the installation instructions, see Chapter 6.1.2.
6. Control cable sizes and the grounding system are explained in Chapter 6.2.1.
7. Select the most appropriate application from the Menu
M6
, page
6.1
.
Instructions on using the keypad are given in Chapter 7.
8. Select the language of the keypad from the Menu
M6
, page
6.2
. Instructions on
using the keypad are given in Chapter 7.
9. All parameters have factory default values. In order to ensure proper operation,
check the rating plate data for the values below and the corresponding
parameters of parameter group G2.1.
nominal voltage of the motor
nominal frequency of the motor
nominal speed of the motor
nominal current of the motor
motor cosϕ
All parameters are explained in the Application Manual.
10. Follow the commissioning instructions, see Chapter 8.
11.
The NX_ Frequency Converter is now ready for use.
The Manufacturer is not responsible for the use of the frequency converters
outside the instructions provided.