8. Preparations Before Operation
Check the following items before starting operation:
①
Visually inspect the UPS to verify that there is no visible damage.
②
Check that the UPS is connected to a utility power source that meets the input
specifications.
③
Check that the input breaker MAIN MCCB is set to “OFF”.
④
Check that load devices are connected correctly.
⑤
Check that none of the cable connections is loose.
②
,
⑤
Check input
power source
④
,
⑤
Check load
connections.
③
Breaker is “OFF”.
※
This figure shows E11A202U001.
As for E11A202U001J, shape and
the number of receptacles are
different.