Sun Microsystems 4500/3 Network Router User Manual


 
Chapter 2 The Cluster Platform 4500/3 System 19
c. From a terminal window on the Sun workstation, enter the following
command:
Note If the port is busy, refer to “Troubleshooting the Cluster Platform 4500/3
Installation” on page 69 in Appendix D.
3. Configure the terminal concentrator device:
Power on the terminal concentrator.
Within 5 seconds, after power-on, press and release the TEST button.
The terminal concentrator undergoes a series of diagnostics tests that take
approximately 60 seconds to complete.
Following the diagnostics tests, the
tip window of the administration workstation
should display:
# /usr/bin/tip hardwire
System Reset - Entering Monitor Mode
monitor::