Chapter 2 Installation and Service 2-5
FIGURE 2-2 Injector/Ejector Latch and Locking Screw
5. Hold the bottom disk cage with one hand and top injector/ejector latch with the
other hand, as shown in
FIGURE 2-3.
Note – The following steps apply regardless of how many ARTMs are in the chassis,
as long as there is an available slot for the ARTM you are installing.
injector/ejector
latch
retention screw