Symmetricom S100 Network Card User Manual


 
48 S100 User Guide – Rev. D – June 2005
SyncServer S100
Test Results dialog
This screen shows whether the IRIG-B for your S100 failed or passed. In this example, the
IRIG-B failed.
There is no output to the “Mail test” field as no addresses had been provided in the System
Information dialog (Figure 3-35
).
Click Finish.
Setup Complete dialog
This screen verifies your configuration of the S100:
Its time source
Modem phone number (if you designated dial-up as the backup source for time)
Host name
System location
Administrator e-mail
Figure 3-37: Test Results shown
Figure 3-38: Your IRIG set-up is complete