Allied Telesis GS900/5E Switch User Manual


 
22
Chapter 2
Installation
This chapter contains the following sections:
“Reviewing Safety Precautions” on page 23
“Selecting a Site for the Switch” on page 24
“Planning the Installation” on page 25
“Unpacking the Switch” on page 26
“Installing the Switch on a Table or Desktop” on page 27
“Installing the Switch on a Wall” on page 29
“Installing the Switch in a Rack” on page 32
“Cabling the Switch” on page 35
“Powering On the Switch” on page 36